Hemp
Homes - Further Construction
|
| |
|
|
|
| |
|
|
|
| |
 |
|
 |
| |
25. Laying ceramic tiles over hemp floors
|
|
26. Ceramic tiles being bonded with hydraulic lime
and sand
|
| |
|
|
|
| |

|
|

|
| |
27. Ceramic tiles now grouted with hydraulic lime and
sand - the finished floor is breathable and warm
|
|
28. Isochanvre cast into internal walls provides good
sound separation between rooms
|
| |
|
|
|
| |
 |
|
 |
| |
29. Isochanvre is left unfinished inside and dries
to a soft buff colour. It provides excellent thermal
and acoustic performance and the buildings remain dry
and echo free
|
|
30. Isochanvre is laid between floor joists to improve
the sound separation from first to ground floor - a
familiar problem in modern houses simply overcome
|
| |
|
|
|
| |

|
|
 |
| |
31. Houses now finished with hydraulic lime render
and yellow ochre lime wash
|
|
32
|
| |
|
|
 |