  FRAME FABRICATION    
   
 

9. Most frame sections need routing out to improve the bond with the isochanvre. A platform is constructed on which to assemble the studs

 

10. After fabrication the frames are stored in the compound

  PRE-ASSEMBLY  
   
 

11. The braced frames are moved from the compound to the next plots by fork lift with a crane jib attachment

 

12. Oversite and scaffolding platforms in place

  FRAME ASSEMBLY    
   
 

13. Cranes lift the frames over the top of the scaffolding into a temporary position

 

14. Frames are positioned and fixed with holding-down straps

  CONSTRUCTING ROOF    
   
 

15. The roof trusses are delivered on site and later crane handled direct onto the scaffolding round the Hemp Houses

 

16